- Paul Conrad
Factory Refurbishment
Updated: Jun 20, 2022
Client: Very large Mining Conglomerate
Requirements:
1. Confirm Beam Lengths to replace existing beams.
2. Map location and elevation of the angle brackets.

Fig: Registered Point Cloud
Deliverables: DWG files and PDF files
Methodology:
- Several setups to capture the beams and attachments.
- Clean up and Register Point Cloud
- Extract the requirements using Revit
Equipment used: Topcon Sokkia GLS 2000
Software: Magnet Collage and AutoCAD
